Mindmajix

Primavera P6 Training

145
Primavera P6 Training
4.5 126

Oracle Primavera P6 Training helps attendees to manage projects, programmes and portfolios. It includes project management, product management, collaboration and control capabilities and integrates with other enterprise software.


Date :
27 Jan 2017
Course Duration (Hrs) :
30
Date :
28 Jan 2017
Course Duration (Hrs):
30
Date :
29 Jan 2017
Course Duration (Hrs):
30
Contact Us Now!    

Oracle Primavera P6 is the most sophisticated, project portfolio management software in the world today. P6 can be used to plan a project, simultaneously, manage a multi-year, globally-distributed set of engineering projects involving workers, machines, and materials. It can give an organization the ability to manage current projects, plan future projects, and make key metrics to improve processes and ensure future success.

Primavera P6 Training Overview

Training is designed to begin with a gentle introduction to P6, covering all of the main aspects of the product. This course, aims not only imparting theoretical concepts, but also helps students explore and experiment the subject. By the end of the course, you will be equipped with how to budget, prioritize, plan, administer, and manage multiple projects; optimize limited, shared resources; control changes; and consistently move projects to on-time and on-budget completion. Our training guides you on how to play with customizable interfaces, scalable and flexible tools, and easy integration with project management software outside of the P6 suite. The Oracle Primavera  training module covers how to work breakdown structures (WBS), organizational breakdown structures (OBS), user-defined fields and codes, critical-path-method (CPM) scheduling, and resource leveling.

 

Primavera P6 Training Curriculum

curriculum_moduleConstraints

This module provides an introduction to Oracle primavera, the constraint types and how they are applied.

Describe the available constraint types
Apply a constraint to an individual activity
Add notebook topics to constrained activities

curriculum_moduleCustomizing Layout

An overview of Layouts, types and customizing layouts based on requirements.

Layout
PERT
Gantt Chart (it is founded by Henry Gantt in 1910)
Activity codes


Resource leveling is a process that helps you ensure, that sufficient resources are available to perform the activities in your project according to the plan.

Adding Resources
Cost accounts
Expenses
Budgeted cost
Roles

This module explains the different project utilities.

Export
Import
Copying a project
Global change
Filters
Publishing the project

A baseline is a complete copy of a project plan that you can compare to the current schedule to evaluate progress. Within layouts, you can display baseline data in graphical and column data format to perform cost and schedule analysis. Learn how to create baselines in this module of training.

Create Baseline
Assign baseline

Learn, how the tracking features assist you in performing schedule, cost, and resource analysis by enabling you to access, display, and manipulate project data in a variety of formats.

Update progress
Enter actual work for resource assignments

In addition to providing a large library of standard project management reports, two reporting tools are available to access and report information stored in the database: the Report Wizard and the Report Editor.

Generate reports
Printing of the project

A few more advanced topics are explained in this module.

Earned value analysis (BCWS/ACWP/BCWP)

 

Primavera P6 Course FAQs

Our trainers have relevant experience in implementing real-time solutions on different queries related to different topics. Mindmajix verifies their technical background and expertise.

We record each LIVE class session you undergo through and we will share the recordings of each session/class.

Trainer will provide the Environment/Server Access to the students and we ensure practical real-time experience and training by providing all the utilities required for the in-depth understanding of the course.

If you are enrolled in classes and/or have paid fees, but want to cancel the registration for certain reason, it can be attained within 48 hours of initial registration. Please make a note that refunds will be processed within 30 days of prior request.

The Training itself is Real-time Project Oriented.

Yes. All the training sessions are LIVE Online Streaming using either through WebEx or GoToMeeting, thus promoting one-on-one trainer student Interaction.

There are some Group discounts available if the participants are more than 2.

As we are one of  the leading providers of Online training, We have customers from USA, UK, Canada, Australia, UAE and other parts of the world. We are located in USA.

Mindmajix Technologies Inc

14 Pasco Drive
East Windsor, Connecticut, 06088
United States (US)
Phone: 201 378 0518

 

Job Support

Mindmajix Job support’s aim is to train and support as many young IT professionals as possible in achieving their tasks for attaining quality jobs in the regular workforce.

For a fresher in IT, the actual requirement of programming and development standards could be partially or completely different in the job environment. Job support gives graduates that extra guidance before or after they attempt employment into IT sector by assisting them with the Primavera P6 training by highly experienced and real time professionals with full stack technical background in the Primavera P6 field. They address your complete issues that you face periodically.

We have wide-spread services across India, USA, Australia and other countries, assisting software employed people to excel in their jobs when they have an onset of a worsening condition.

Our trainers support you solve your technical problem and guide you to the right path in order to obtain a favourable solution. Once we understand your project, the subsequent problems are solved even better and faster.

What we assure?

* Our trainers make it a point to make you capable of understanding the real world scenarios.

* Our trainers will provide exceptional Technical assistance and help you out solve your Technical problems at your jobs in an efficient way.

* We assist the person learn a new job, and ensure extra assistance or a different format for learning the role vividly.

We Specialize in providing most reliable support and you can entirely entrust to us.

Drop Us A Query


Course Reviews

4.5

126 ratings
  • 588
  • 419
  • 313
  • 25
  • 11
Copy Rights Reserved © Mindmajix.com All rights reserved. Disclaimer.
Course Adviser

Fill your details, course adviser will reach you.